youchallengeyou

Make Nine

Choose nine specific craft projects on January 1 and finish all nine by December 31, resetting your challenge count to zero if any project remains incomplete at the end of the year.

The rules

  1. Select exactly nine distinct projects, patterns, or targeted skills across sewing, knitting, or related crafts before starting; launching without a finalized nine-item list fails the challenge.
  2. Complete all nine chosen projects within the single calendar year ending December 31; leaving any of the nine projects unfinished at midnight on December 31 counts as a failed challenge.
  3. You may swap a selected pattern or material if a project proves technically unworkable, provided you document the replacement before cutting fabric or casting on; abandoning an item without substituting and finishing a new one fails the challenge.
  4. Count only fully finished, usable items; wearable mockups, unhemmed garments, or unblocked swatches do not clear a spot on your roster.
  5. Construct every item yourself from raw materials; outsourcing structural work like machine stitching, garment assembly, or knitting sweater panels fails the challenge.

What it is

Rochelle New launched Make Nine on her Lucky Lucille craft blog in late 2016 as an open annual event for 2017. Designed as an antidote to frantic, high-volume crafting, it borrows Instagram's three-by-three photo grid to organize a maker's yearly queue into nine distinct sewing, knitting, or fiber projects. The challenge tests project estimation, fabric budgeting, and execution stamina across 365 days. Unlike Me Made May, which focuses on wearing existing handmade garments throughout a single month, Make Nine governs the actual construction of nine discrete pieces across an entire year.

A common misconception is that Make Nine requires nine complex, full-scale wardrobe centerpieces like tailored wool coats or intricate colorwork sweaters. Rochelle New created the format as a low-pressure planning framework where a knit beanie, an altered neckline, or a pair of oven mitts clears a square just as legitimately as a lined trench coat. The objective is finishing an intentional list rather than inflating your total output or draining your bank account on supplies.

Why it works

Make Nine works by restricting choice overload and counteracting the planning fallacy, an error documented by psychologists Daniel Kahneman and Amos Tversky in 1979 where people routinely underestimate the time needed to finish future tasks. Most crafters purchase fabric and yarn far faster than they stitch, leaving dozens of untouched patterns across their workspaces. Restricting the calendar year to nine items imposes a strict boundary on acquisition. Spreading nine items across 52 weeks allocates roughly 5.7 weeks per project, creating an observable time buffer that absorbs fitting adjustments, gauge swatches, and seasonal delays without blowing up the schedule. While empirical research on craft-based goal setting specifically is thin, research on implementation intentions by psychologist Peter Gollwitzer shows that defining concrete targets in advance significantly increases completion rates over open-ended production goals.

How to start

  • Audit your fabric stash and pattern bins on day -7 to select materials you already own for at least five of the nine slots.
  • Choose your nine projects on day -5, balancing six familiar patterns with three skill-building designs that require techniques you have not mastered.
  • Create your three-by-three visual grid on day -3 using digital image software or a printed paper sheet.
  • Purchase all missing notions, needles, threads, and zippers on day -2 so missing supplies never stall an active build.
  • Post or hang your completed nine-square grid in your workspace on day -1 to fix your commitments.
  • Cut fabric or cast on yarn for project 1 on day 1 according to your first-quarter schedule.

The daily plan

PhaseDaysProject TargetFocus and DeliverablesWeekly Rhythm
Phase 1: Winter FoundationsDays 1 to 90Projects 1 and 2Heavy garment or complex knit plus one quick accessory5 hours weekly: 1 hour prep, 3 hours stitching, 1 hour pressing
Phase 2: Spring TransitionsDays 91 to 180Projects 3, 4, and 5Lightweight apparel, midweight layers, and utility items4 hours weekly: 1 hour pattern fitting, 3 hours construction
Phase 3: Summer SprintsDays 181 to 270Projects 6 and 7Small-scale accessories, linen tops, or sock knitting3 hours weekly: portable stitching in 30-minute sessions
Phase 4: Autumn Final PushDays 271 to 365Projects 8 and 9Outerwear, holiday garments, or final complex sweater6 hours weekly: dedicated weekend blocks for finishing and hems

What success looks like

  • Midpoint check: by day 182 (June 30), at least four of your nine projects are completely sewn or knit, pressed, and functional, with project 5 actively on your work table.
  • Final milestone: by day 365 (December 31), all nine squares on your tracking grid are completed and in regular use, with zero pending hems, unpicked basting stitches, or unblocked panels.
  • Stash reduction: at least five of the nine finished items used fabrics or yarns that sat in your storage bins prior to day 1.

Where people quit

  • Front-loading complex garments: picking nine high-skill patterns leads to burnout around day 75. Fix: Assign difficulty tiers during setup, pairing every intricate project with a rapid one-day make.
  • Sourcing bottlenecks: pausing on day 120 because you lack the correct interfacing, buttons, or needle gauge. Fix: Order all notions for the first four projects during setup week.
  • Summer temperature drop-off: heavy wool knitting becomes unappealing around day 200 (July). Fix: Schedule lightweight linen garments, swimwear, or cotton accessories for third-quarter production.
  • Alteration paralysis: getting stuck on fitting alterations around day 290 and shelving the garment. Fix: Give yourself a hard 48-hour limit to adjust a seam; if fit issues persist, finish the hem anyway and record the adjustment notes for future patterns.

Variations

  • Make Nine Stashdown (Easier): Require every single cut of fabric, skein of yarn, and notion to come exclusively from materials owned before January 1, eliminating supply shopping entirely.
  • Skill-Builder Make Nine (Harder): Dedicate all nine slots to techniques you have never executed before, such as welt pockets, brioche knitting, tailored collars, and fly-front zippers.
  • Duo Make Nine (Partner): Pair with another maker to plan complementary grids, exchanging progress photos every second Sunday to verify completed stages.

Who should skip this

  • Crafters with active repetitive strain injuries: Chronic carpal tunnel, cubital tunnel syndrome, or wrist tendonitis flare under production deadlines; healing timelines must override annual output quotas.
  • Commercial garment sewists: Makers producing inventory for clients need operational flexibility driven by customer orders rather than personal queue constraints.
  • Complete craft novices: Individuals who have never threaded a sewing machine or cast on yarn should build foundational motor mechanics on scrap fabric before setting an annual multi-project target.

FAQs

Can I change my project choices midway through the year?

Yes, you can substitute a pattern or fabric if an initial pick proves unworkable. The original creator framed Make Nine as a flexible tool rather than an ironclad contract, provided you select an exact replacement project and complete it before December 31 instead of quietly dropping your total target to eight.

Do unfinished projects from last year count toward Make Nine?

Yes, you can include existing works in progress on your grid. Assigning an abandoned sweater or half-cut dress to one of your nine squares is an intentional way to clear lingering craft clutter, provided you complete all remaining construction, fitting, and finishing steps during the current calendar year.

Does Make Nine only apply to sewing and knitting?

No, the format works across any hands-on making discipline. Rochelle New developed it within the sewing and knitting communities, but makers regularly apply the nine-item framework to quilting, woodworking, leathercraft, weaving, and embroidery. The only requirement is defining nine discrete physical projects before starting your year.

What happens if I finish only seven or eight projects?

You fail the strict challenge parameters, but you keep the functional items you constructed. Make Nine functions as an annual commitment device; failing to complete all nine projects simply means you misjudged your available hours or pattern complexity, providing baseline pacing data to plan more accurately next year.

365 days, starting whenever you say.

Leave your email and we send check-ins for Make Nine. One click to unsubscribe.